Attic因为电线起火烧过一些,修理有啥主要事项。

c
crbeenuaa
楼主 (文学城)

需要permit或者inspection吗?

b
borisg
how much do you have to rewire?
c
crbeenuaa
刚下offer,还不知道

卖家找了人估价说要15万修理费,我觉得不用,所以赌一把。

b
borisg
这不是瞎OFFER么。
c
crbeenuaa
市场价50万左右,开29万,我的offer接近31万,希望修理要不了15万。
东施爱美
31万加快到15万,也接近50万了呀。关键是contractor 很难给你一步到位包括所有。

有的contractor 还会拖啊拖啊,等到你花儿都懈了。说不定还要来场官司。

c
crbeenuaa
这是修理工列出来要修的东西。不知道多少可以不用。我怀疑是老外公司狮子大张口。

Mask off lower areas of home where access to worksite are from project debris. Remove carpet from the upstairs work area and haul away
remove all blown in insulation in area where trusses to be removed. Remove all Sheetrock from ceilings where trusses will be removed. hire crane service for removing and installing new trusses
remove 6 in of drywall min around perimeter/exterior walls to expose any clips/hardware holding trusses down. brace all interior walls for when trusses will be removed. Remove roofing on area where trusses will be removed. Have electrician remove all ceiling lights and wires that are compromised. Remove truss system from home and reinstall new engineered trusses. re-sheet new trusses and re frame lay on roof areas.
install all needed bird blocks and blocking on new truss system
re roof entire roof with new Malarkey SBS shingles
repaint all exterior soffits
provide and install new gutters where removed
have electrician re wire all lights and switches that were removed for construction. replace all ducting, H VAC that was damaged in the fire
repair all plumbing vents that were damaged in fire. re side gable end wall and paint siding to match. Hang new Sheetrock on all ceilings and walls that were removed. Mud tape and texture all new sheet rock to match existing
Prime and paint entire interior walls, ceilings, and trim/doors using Sherwin Williams paint products. Re insulate ceiling up to current code standard. replace back door from garage with new pre hung exterior door. open up moldy areas in garage to asses the mold situation and advise from there. Replace all carpeting and pad in home. All construction debris will be hauled off site via dumpster
Make ready clean.

东施爱美
你管他列出来多少,一但你用了,人家就有办法给你dig dig dig, 然后让你put more and more money
b
borisg
how large an area(just 2nd floor?)
c
crbeenuaa
Attic only,二楼的天花板都是好的,我感觉骨架被烧了一些。
c
crbeenuaa
就是看能不能只换一些木头,而不用怎个屋顶骨架都换。
b
borisg
didn't burnt through the roof?
c
crbeenuaa
可能有一小角被烧穿了。
b
borisg
你这人做什么生意啊,我问三句话也问不出个P来。有多大面积?
c
crbeenuaa
看不见面积,有一小块布遮住屋顶一角,几平米?
c
crbeenuaa
很多未知,所以说是赌:(
b
borisg
let's say one room, 10x10.

rebuilt 10x10 as new construction. $150 /sqf base price. you need to multiply by 2 because you really don't save labor for such a small area. Say 30000. And put in another 5-10 k to fix up smoke damage to the rest of the house, inside and outside.

I probably can do it for 5000 plus another 5k for professional services. but you are not me. 

东施爱美
波大我觉得面积大一点小一点只是多几块木头,主要的是人工的投入和时间的投入耗不起。
c
crbeenuaa
如果这么便宜就赌对了,不过不好,听说已经8个offer了,形式不妙。
h
hhtt
阁楼顶梁烧坏了,即使很短一段,整个顶梁都要换!人工是你主要的开销!
b
borisg
是啊,没看见我乘了个2么。
c
crbeenuaa
这家公司的quote是要全换,还得上起重机啥的。

卖家是公司,看准了都猛宰一刀:)

c
crbeenuaa
都像你这样懂得人来bid,我感觉我的offer没戏了。
宁静的自由人
没说修这么多多少钱吗?
c
crbeenuaa
150k
h
hhtt
不这样做,通不过镇的检查和保险公司。你这栋房子现在的情形,就好像是二楼盖好了,就差一个屋顶?
宁静的自由人
估计owner不会disclose保险公司赔了多少. 那基本就是请美国正式公司修的价钱.
香香生煎馒头
你自己有执照吗?
h
hhtt
现在听下来,楼主这房子是给Contractor用来Flip的。不是地主用来掏粪的。
香香生煎馒头
就是觉得楼主未必能赚到大头…
h
hhtt
不容易!
c
crbeenuaa
没执照,全请人,就是觉得老美给的quote有点离谱