Day 12: 开始铺地板砖。工作很忙,上午出门的时候contractor还没来,所以我们先在地上摆了一下地板砖的图案,我还写了一个说明。LG把地热的说明书和DVD和地热的材料放到了一起。下班回家的时候地板砖已经按我们的要求铺了一半了(我们买的是仿木地板的地板砖,所以安装要麻烦一些)。地热的安装好象也还合格。
Day 13: 地板砖和地热铺完了。
Day 14: 今天contractor没来,要等水泥干,但是我们晚上回家又检查的时候发现了他们昨天犯了一个大错误 -地热的sensor居然没有装。而且有一块地板砖还有一块缺口。
As part of the negotiation with the contractor, I didn't pay extra for installation. The main extra cost for me is material cost, which depends on the size of your room. The master bath costs probably $500 and kitchen is about $1000.
The price from costco is probably one of the lowest: You can find the price here
As part of the negotiation with the contractor, I didn't pay extra for installation. The main extra cost for me is material cost, which depends on the size of your room. The master bath costs probably $500 and kitchen is about $1000.
The price from costco is probably one of the lowest: You can find the price here
不幸的事情又发生了,橱柜还是没有8尺水平,比上次好很多,但是还是没有完全水平。好在LG还比较handy,亲自出马把橱柜调好。这样才能装 countertop.不然的话,他们再来一次还要花几百大刀。其实最好是让contractor在现场,让他们来调,确保没问题了再走。--我做re-surfacing, 水平也会出问题吗? --- It is possible but very unlikely
不幸的事情又发生了,橱柜还是没有8尺水平,比上次好很多,但是还是没有完全水平。好在LG还比较handy,亲自出马把橱柜调好。这样才能装 countertop.不然的话,他们再来一次还要花几百大刀。其实最好是让contractor在现场,让他们来调,确保没问题了再走。--我做re-surfacing, 水平也会出问题吗? --- It is possible but very unlikely
准备厨房装修已经有一年多了,因为工作的缘故,一直都是拖着。现在工作还是很忙,不过还是下定决心把厨房给装修了。不然总是一块心病。
是2月25日开始的,现在还在装修过程中。决定每天来给大家汇报一下进展,这样对准备装修的id们应该会更有帮助。先为前几天占几个坑,等我回家再填。
rewarded by江南
[此贴子已经被作者于2011/7/16 18:06:16编辑过]
先想清楚大概的布局。我觉得如果可能的话,最好是住了一段时间之后再remodel 厨房,这样才比较清楚需要改造的地方。还可以到附近有同样的floorplan的房子里去看看别人是怎么改造的,看看有什么地方可以借鉴。我觉得我们买了房子之后看open house比买房子之前还积极。
2. 画草图
想好布局之后,如果要动结构的话,可以用ikea家的免费软件kitchen designer来做初步设计,还可以看见3D的效果。这样的草图在面试ontractor的时候很有用。
3. 找contractor
我们第一次装修的时候已经面试过了几个contractor了。最后选的contractor还可以,但是就是比较麻烦,多干一点就要加钱什么的,而且也不愿意干以前没做过的东西。这次就没有再找他。
去年陆陆续续面试了两个这个版上JM们推荐的contractor,还有从ServiceMagic上找的和其他人推荐的,最后选了一个版上推荐而且刚刚给我的同事家装修了厨房。名字暂时不提,等装修完毕,再决定是不是值得给大家推荐吧。
ServiceMagic上找的contractor大多很贵,不过还是值得面试一下。因为他们一般会给非常详细的估价,可以用来了解一下装修的过程,和写装修合同。
4. 申请permit
申请permit其实不难。可以让contractor给申请,也可以自己申请。我们两次都申请了permit, 这次是自己申请的。
我们是自己用smart draw画的floor plan。画好了图之后就可以去市政府去申请permit了。第一次没通过,因为要拆墙和suspension ceiling,还要需要画cross section图。这个是请人画的。也找了好几个人来给估价,最后找的是最便宜,但是也是我们最喜欢的一位。只要$100一张图,而且免费修改至拿到permit为止。我们拿到他的图之后第二天就又去了市政府,当场拿到了permit。(Keith Farrell <terrencefarrell AT hotmail.com>)
5. 建一个临时厨房
让contractor帮我们把冰箱移到了在wet bar的地方,然后又保留了电饭锅,高压锅,微波炉和一些碗筷,建了一个临时厨房。这样就不用每天到外面去吃饭了。如果是夏天的话,BBQ oven也能派上大用场。
[此贴子已经被作者于2011/4/5 13:38:05编辑过]
Day 1:
刚刚拿到permit,第二天一大早contractor就来拆厨房了。先在地上铺了纸,厨房附近的家具上铺了塑料纸,因为要拆墙,还从天花板到地板之间也用塑料纸做了一面"墙"。等我们下班回家的时候旧厨房就已经完全被拆掉了。
因为被拆掉的墙虽然不是承重墙,但是有可能是shear wall。所以要叫city的人来确认一下。如果是shear wall的话,就需要另外加固一下才行。所以当天打了电话,约了inspector周一来检查。
Day2:
contractor今天去买了很多东西。然后开始改装电路和水管。电路的工程比较大,因为要加recessed light和三个吊灯,还要加一根220v的线。吊灯是早就选好了的,没有什么麻烦。
LG
头一天晚上研究了一晚上recessed light的安放问题。因为我家是vaulted
ceiling,所以需要特别的trim.我们一大早就跑到Lamp Plus去看recessed
light,然后又从卖灯的MM那里得知了厨房必需要符合code 24的节能要求。我希望厨房的灯可以dimmable.
这一下就只能买LED的灯了。
本来是打算买4寸的小recessed light的,但是发现太贵了。决定改买6寸的LED
recessed light。 不过这样一来,LG头天的设计就作废了。我们又跑到了Homedepot看到比Lamp
Plus更便宜的LED灯。于是决定回家重新设计,第二天再来买。不过一部分还是要买适合valuted ceiling的eye ball LED,
还是得在网上买。
回来发现contractor主动按code要求把水管改造了一下。电路的工作还得接着做。
[此贴子已经被作者于2011/3/6 13:34:31编辑过]
LG又花了一晚上的时间设计好了灯的布局。我们一大早就跑到Homedepot把recessed light和housing买了回来。constractor下午就把它们都装好了。
Day 4.
contractor今天没来, 因为今天是city inspector来检查确认被拆掉的墙不是shear wall的日子。Inspector进来一看就知道不是shear wall,所以没有意料之外的麻烦。然后我们让他顺便看了一下其他的地方,指出了一些下次rough inspector的时候需要改进的小地方。
我们的经验是owner特别是女主人和他们打交道比较容易一些。上次的final inspection的时候,那个city inspector还大夸了一番我们的装修设计还问我为什么懂这么多建筑知识(其实很少)。
[此贴子已经被作者于2011/3/6 0:43:50编辑过]
今天让contractor按city inspector提出的要求做了一些小改动(主要是改了接线盒的位置),然后加上了insolation. 这样第二天我们就可以让city inspector来做rought inspection了。
Day 6:
上午contractor继续昨天的工作,主要是在外墙的上方打一些小孔来透气,然后他们又离开了。下午city inspector来做rough inspection。和上次来的人不同,不过也很nice。看了一下上次提到的问题都解决了,也没有发现什么新的问题,就给我们签字通过了rough inspection。原来这个city inspector家也在装修厨房, 然后我们又聊了一会儿装修的事情。
Day 7:
rough inspection通过了之后就可以把墙封起来了,地上也加了水泥板准备装tile。
我们几个月前就到Porcelanosa拿了好些sample, 选好了地砖和backsplash。不过上午还是又跑到了Porcelanosa一趟,问了一下具体的安装方案和价格。
[此贴子已经被作者于2011/3/6 0:41:16编辑过]
今天没有什么大变化,主要是给dry wall喷上涂料,为下一步油漆准备。我让LG按ayane MM的贴子的提示给Corner stone打电话,然后要求Porcelanosa price match。最后的价格比起contractor discount要底一点点,不过蚊子肉也是肉嘛。反正打几个电话也很快的。
Day 9:
Primer
Day 10:
油漆
Day 11:
把island的橱柜装好
Day 12:
开始铺地板砖。工作很忙,上午出门的时候contractor还没来,所以我们先在地上摆了一下地板砖的图案,我还写了一个说明。LG把地热的说明书和DVD和地热的材料放到了一起。下班回家的时候地板砖已经按我们的要求铺了一半了(我们买的是仿木地板的地板砖,所以安装要麻烦一些)。地热的安装好象也还合格。
Day 13:
地板砖和地热铺完了。
Day 14:
今天contractor没来,要等水泥干,但是我们晚上回家又检查的时候发现了他们昨天犯了一个大错误 -地热的sensor居然没有装。而且有一块地板砖还有一块缺口。
[此贴子已经被作者于2011/3/19 21:30:02编辑过]
不得不返工,否则地热根本没有办法用。contractor需要把已经安装好的地板砖敲掉几块才行。可是这一敲就敲出了大麻烦。敲一块地板砖,附近的地板砖的表面的釉质就裂开了。再敲几块,岂不是要整个地板重做?
最后还是我们根据网上的说明给他们出主意,先用masking tape把附近的地板砖都贴起来,然后先在要敲掉的地板砖表面划十字,再沿十字敲。这样终于成功的敲掉了几块,没有把损失继续扩大。然后contractor加sensor。但是没有可以用来替换的地板砖了。虽然我们多买了10%的地板砖,但是还是不够。
于是我和LG则赶快跑到Cornerstone去买了地板砖, 因为我们上次买的时候把Porcelanosa家的这种地板砖的货都买光了。没想到Cornerstone之后,人家告诉我们他们也没有现货,需要向Porcelanosa家定。我们只好给Porcelanosa家打电话,好在他们家又有了新货,虽然只有20几个sqrt,但也够了。于是我们赶快马不停蹄的开到Porcelanosa。他家还很忙,等了半天才抓到一个人来帮我们,买了7块地板砖。然后我们又去contractor家开了他的truck回来,到Ikea买了一块cover panel运回家。
折腾了大半天,没想到在离家还有10分钟的地方又碰上了traffic jam。原来是整段路不知道为什么被警察给封起来了。于是有只好绕道龟速前进。平时只要一分钟的路程,居然花了半小时。回到家已经是8点了,两只猫被关了一天还饿了肚子也很不满。
[此贴子已经被作者于2011/3/19 21:25:06编辑过]
Day 16
不幸的事情又发生了。新买的地板砖和原来的不是同一批次的,颜色不一样。还是不能用。但是Porcelanosa周日不开门,只能等周一。
先让contractor把剩下的橱柜装好。然后按我们的设计把所有的橱柜的四周都用面板包起来。看上去更象build-in的样子。
Day 17
contractor去了Porcelanosa.已经没有我们要的地板砖的存货了。得从Miami调货,需要等两周。两周就两周吧。反正还有好多事情要干呢。
contractor只来了半天,把剩下的一些小活干完就走了。
LG给做counter top的地方打了电话约了过两天来做template.
Day 18
今天contractor没有来。不过我们发现wet bar的luminate的counter top有些被破坏了。本来不打算改造wet bar的,但是现在不改也不行了。于是给contractor打电话,让他们把counter top和上面的架子给拆了。下面的base cabinet还不错,就不换了。
Day 19
contractor来了半天,把counter top和上面的架子给拆了。我们又叫他们把oven和cooktop的插座移了位置,以便将来维修方便。
Day 20
做counter top的地方 (United Marble and Granite)派的来做template的人一大早就来了。是个老墨,不过感觉还挺professional的。我们给他说了要换web bar的counter top的事情,他说没问题。
不过做template的时候又出了问题。橱柜居然没有安装水平,前面也没有完全平行。大概是contractor没有足够长的水平尺,没能发现这个问题吧。总之还需要调整之后才能装counter top。我们只好赶快给contractor打电话,让他来看看能不能做相应的调整。contractor说要半小时之后才能赶到,到时候也许老墨就走了。不过我们还是让他来,先让老墨做其他地方的template。最后contractor正好在老墨准备要走的时候赶到了。我们给他解释了一下情况,然后他确认是没问题,下午就可以做相应的调整。总之下午我们下班回家的时候橱柜好象是调好了。
Day 21-27
contractor这段时间都没有来,因为要等counter top装好了才能继续干活。
[此贴子已经被作者于2011/4/4 20:02:21编辑过]
今天工人来装counterop。有一点重要的地方是如果要装undermount的sink的话,做template的时候他们就会把sink带走。如果是overmount的话,那么装counterop的时候就会照sink的大小现切割出一个装sink的槽来。然后还有需要把faucet,air gap,soap dispenser之类的都买好,这样装counterop的工人才好给counterop打孔。
不幸的事情又发生了,橱柜还是没有8尺水平,比上次好很多,但是还是没有完全水平。好在LG还比较handy,亲自出马把橱柜调好。这样才能装countertop.不然的话,他们再来一次还要花几百大刀。其实最好是让contractor在现场,让他们来调,确保没问题了再走。
然后有一点前面忘说了,我们买的是caesarstone snow white的countertop。买过countertop的ID都知道,不同的边沿处理会直接影响价格。我们选的是最普通的Erased flat edge,因为本来就是要minimum的效果,但是中间的接逢如果仔细看的话是可以看出来的。本来我还想要upgrade到Erased mitered edge,这样接逢完全和边缘一致完全看不出来。但是没想到给我们做countertop的公司(United Marble and Granite) 为了确保我们满意,居然主动给我们upgrade,一下子给我们省了好几白刀。
他们的工人也很professional,安装得很好,还把工地打扫得很干净。真是不错。
装了countertop之后,整个厨房也初见雏型了。赶快给contractor打电话让他们来装水龙头,电器和backsplash等等。
Day 29
countertop需要等24小时才能踩,所以今天没有什么进展。
Day 30
contractor来装backsplash和水龙头。我们上班先给他们说好了安装的方案,中间不放心还跑回家看了一下。最后回家的时候都按我们说的装好了,没有出什么问题。
Day 31-32
contractor来装电器和给backsplash上grout. 其间又出了一个小乱子。我们买的Miele induction cooktop的安装说明书明确说不要在其边沿上caulk.为了确保他们看见,我还在cooktop上面贴了一个post-it的纸条写了"Do not caulk",结果回家一看还是给caulk上了。又只好给contractor打电话,让他们把caulk给去掉。好在去掉caulk还很容易,不然的话又是一个大乱子。
-------------------------
还有许多曲折,有空再填
[此贴子已经被作者于2011/5/6 14:54:06编辑过]
[此贴子已经被作者于2011/4/23 21:59:03编辑过]
mm做事细心又有条理,好想看成果图啊,如果还有施工图也多贴几张吧,我也喜欢没有吊柜的厨房,觉得我们家厨房结构应该跟你们的差不多,打算明年重装,可惜我们屋顶上有暖气管道,肯定打不开了。。。
另外这个cat fence就是一个网状的东西嘛?是软的还是硬的呢?今天小猫跳到邻居家里去了,害得我找了一圈儿,看来也得装点儿什么防着他。
Cat Fence: http://www.catfencein.com/
Cat Fence: http://www.catfencein.com/
啊,比fence高这么多?我印象里好像没这么高。这下麻烦了。很可能HOA会干涉。我先问问去吧。
啊,比fence高这么多?我印象里好像没这么高。这下麻烦了。很可能HOA会干涉。我先问问去吧。
You don't have to install it so high. So don't worry.
[此贴子已经被作者于2011/4/19 17:19:53编辑过]
请问如何知道是否要申请PERMIT?比如改换电线和水管是否要申请?请提供你的意见。谢谢!
Check with your city. Normally you will need to get permit for plumbing and electric work.
MM有几个房间是地热的呢?
two rooms: kitchen and master bathroom
进来看看,还没更新吗?
finally passed the final inspection today and will post updates soon
two rooms: kitchen and master bathroom
能说下加了地热之后的费用大概多多少么?谢谢
能说下加了地热之后的费用大概多多少么?谢谢
The cost for usage or for installation or for materials?
[此贴子已经被作者于2011/4/19 17:40:02编辑过]
The cost for usage or for installation or for materials?
[此贴子已经被作者于2011/4/19 17:40:02编辑过]
全算下来吧,大概其比不加地热的能贵多少呢?
全算下来吧,大概其比不加地热的能贵多少呢?
As part of the negotiation with the contractor, I didn't pay extra for installation. The main extra cost for me is material cost, which depends on the size of your room. The master bath costs probably $500 and kitchen is about $1000.
The price from costco is probably one of the lowest: You can find the price here
As part of the negotiation with the contractor, I didn't pay extra for installation. The main extra cost for me is material cost, which depends on the size of your room. The master bath costs probably $500 and kitchen is about $1000.
The price from costco is probably one of the lowest: You can find the price here
很不错阿!我还以为很贵呢。。那我也得加上!
恭喜MM了 :) 我们还有很多要做呢, 架子是搭起来了, 现在电工,管道工一起做工, 我爹妈在家里给我监工, 我爹特好奇, 每天在外面看半年他们怎么搞的, 我们回家以后还能绘声绘色的描述哪个人做的好, 哪个人苯死了, 和和 :) 下周就和contractor 一起order石头去了... MM 有没有好的glass / mirror 的地方推荐呢? glass 好象很贵的样子.
mirror:
Roadrunner Glass Fremont
4246 Peralta Blvd.,
Fremont, CA 94536
shower glass:
United Carpet Construction SplUnited Carpet Construction Spl
lz,厨房是自己设计的吗?有专业水准啊!!
很心水这个厨房,美啊!请教MiM 一个问题,我家厨房和entry是联通的空间,所以只能做成一样的,我也喜欢这种地板一样的tile.但是家里其他地方,除了厕所都是地板了。如果厨房 entry也装这个会不会感觉rectangle 太多,会busy吗?
如果颜色很接近的话,应该没问题。因为看上去是一体的感觉。否则的可以考虑用大块的瓷砖。
[此贴子已经被作者于2011/5/4 16:13:45编辑过]
wow~, so beautiful!!!
lz,厨房是自己设计的吗?有专业水准啊!!
谢谢喜欢。是自己花了不少时间设计的。
谢谢喜欢。是自己花了不少时间设计的。
嫩.... 快补烂尾楼...等UPDATE等的你又要remodel了...
嫩.... 快补烂尾楼...等UPDATE等的你又要remodel了...
哈哈。MM太了解我了。我现在又开始琢磨弄个native plant garden呢。不过在MM的督促下,我决心等周五的时候来把楼添完。
Landscaping我设计不了,可能需要请专业人士。不过听说15万还算是small budget, 那我家就是nano-budget。
MM要是知道什么好的designer给我推荐推荐? 如果能提供free initial consulting最好。
谢谢Leico.我家的地板颜色比较深,有点像cherry,但是拿了到tile店去比 看起来颜色有差别。 而且我可能用红色cherry的柜子,是不是只能用颜色浅点的tile,拿了个oak其实很像白色的地板tile sample 回家放在entry 地上。 左边是Living room, 右边是上下的两个楼梯,都是地板,感觉白色的tile 有点淡,好像镇不住。很喜欢地板式样的tile.很防滑,孩子可以在上头跑。Ikea的玻璃面的橱柜会不会比一般的贵很多。真是很美,还好清洁。 装修太伤脑筋啊。MM的品位很好,给LD看你家图片,他以为这是装修杂志。哈哈。
[此贴子已经被作者于2011/5/4 16:13:45编辑过]
可以试试中等灰色的地砖? 这种high gloss的橱柜是最贵的一种了。好象比最便宜的要贵一两倍。
哈哈。MM太了解我了。我现在又开始琢磨弄个native plant garden呢。不过在MM的督促下,我决心等周五的时候来把楼添完。
Landscaping我设计不了,可能需要请专业人士。不过听说15万还算是small budget, 那我家就是nano-budget。
MM要是知道什么好的designer给我推荐推荐? 如果能提供free initial consulting最好。
landscaping还真的不是那么容易搞的..... 偶去查查偶家院子是谁搞的... 不能保证查得出来啊...也不能保证价格啊 :( 我周五苦等你的UPDATE !
可以试试中等灰色的地砖? 这种high gloss的橱柜是最贵的一种了。好象比最便宜的要贵一两倍。
谢谢MM的建议!灰色elegant 而且跟cherry 很配。昨天拿了几个sample, 很喜欢白色调的,结果放上去感觉头重脚轻,好像压不住。有一种看起来像灰色和biege的,有点点黑灰色的纹路,看起来像是天然石头的纹路。但是尺寸是20“,我家entry 77sqft, 厨房228, 用20‘的会不会太大?12’的好像感觉太小了,Pattern用什么好呢?厨房虽然看起来挺大的,可是我还要放一个dinning table. formal dinning 被我改成孩子的play room啦。想想我实在太小农了, 汗一个。
谢谢MM的建议!灰色elegant 而且跟cherry 很配。昨天拿了几个sample,
很喜欢白色调的,结果放上去感觉头重脚轻,好像压不住。有一种看起来像灰色和biege的,有点点黑灰色的纹路,看起来像是天然石头的纹路。但是尺寸是
20“,我家entry 77sqft, 厨房228,
用20‘的会不会太大?12’的好像感觉太小了,Pattern用什么好呢?厨房虽然看起来挺大的,可是我还要放一个dinning table.
formal dinning 被我改成孩子的play room啦。想想我实
20的不大. 我觉得正好。pattern就看MM想要什么效果了。想要modern一些就是方格就可以,想要更复杂一些,可以斜着装。
landscaping还真的不是那么容易搞的..... 偶去查查偶家院子是谁搞的... 不能保证查得出来啊...也不能保证价格啊 :( 我周五苦等你的UPDATE !
Countertop是从United Granite&Marble家买的。 以下是引用michldon在5/14/2011 4:58:00 AM的发言:
请问你们从买TILE贵吗?多少钱PER SQ/FT?COUTERTOP 你是哪里买的?另外不知道能发你装修的图片到我信箱因为魅力太低看不到?谢谢!
请问LZ electronic panel 换成100amps 还是200amps. Cost 多少?谢谢!
以下是引用wulala在7/7/2011 10:54:00 AM的发言:
太太太惊艳了.....目前为止看到过的最好看的中国人的厨房...请问MM那个CB2高瓶里的树叶是真的还是假的?哪里有的卖?
day 28
今天工人来装counterop。有一点重要的地方是如果要装undermount的sink的话,做template的时候他们就会把sink带走。如果是overmount的话,那么装counterop的时候就会照sink的大小现切割出一个装sink的槽来。然后还有需要把faucet,air gap,soap dispenser之类的都买好,这样装counterop的工人才好给counterop打孔。
--重要提示啊!谢谢了!
不幸的事情又发生了,橱柜还是没有8尺水平,比上次好很多,但是还是没有完全水平。好在LG还比较handy,亲自出马把橱柜调好。这样才能装countertop.不然的话,他们再来一次还要花几百大刀。其实最好是让contractor在现场,让他们来调,确保没问题了再走。--我做re-surfacing, 水平也会出问题吗?
然后有一点前面忘说了,我们买的是caesarstone snow white的countertop。--我也在找这样的石头这样的颜色,LZ能给个参考价吗?
装了countertop之后,整个厨房也初见雏型了。赶快给contractor打电话让他们来装水龙头,电器和backsplash等等。--哦,你们不是找装countertop的人装水具的。
Day 29
countertop需要等24小时才能踩,所以今天没有什么进展。--为什么countertop要踩??
Day 31-32
contractor来装电器和给backsplash上grout. --很喜欢MM的back splash,是什么材料?能给个参考价吗?是实际需要多少就买多少吗?
[此贴子已经被作者于2011/5/6 14:54:06编辑过]
因为实在没法在同一家装修公司找到满意的既做橱柜re-surfacing,又能买到喜欢的countertop, 我考虑让装修A 做橱柜、找装修B 换countertop、把 overmount
sink换成undermount sink。先后步骤不太明白,请LZ 指点。
是否是
买好新的sink & faucet -> 做counter
top的人来量橱柜面尺寸并带走sink, faucet-> 安装countertop
那么resurfacing在 装countertop之前之后都没问题吗? 如果换sink要和装countertop同时进行?该让哪个labor做?
[此贴子已经被作者于2011/7/20 23:50:40编辑过]
因为实在没法在同一家装修公司找到满意的既做橱柜re-surfacing,又能买到喜欢的countertop, 我考虑让装修A 做橱柜、找装修B 换countertop、把 overmount
sink换成undermount sink。先后步骤不太明白,请LZ 指点。
--- 换countertop + 换sink, resurfacing在 装countertop之前之后都没问题, 不过我个人觉得之后比较好,因为说不准做countertop的时候要调整橱柜。
是否是
买好新的sink & faucet -> 做counter
top的人来量橱柜面尺寸并带走sink, faucet-> 安装countertop
-- Yes
那么resurfacing在 装countertop之前之后都没问题吗? 如果换sink要和装countertop同时进行?该让哪个labor做?
-- resurfacing在 装countertop之前之后都没问题. 换sink让装countertop做
[此贴子已经被作者于2011/7/20 23:50:40编辑过]
countertop.不然的话,他们再来一次还要花几百大刀。其实最好是让contractor在现场,让他们来调,确保没问题了再走。--我做re-surfacing, 水平也会出问题吗?
--- It is possible but very unlikely
countertop需要等24小时才能踩,所以今天没有什么进展。--为什么countertop要踩??
-- 因为要站在上面安装一些东西
Day 31-32
contractor来装电器和给backsplash上grout. --很喜欢MM的back splash,是什么材料?能给个参考价吗?是实际需要多少就买多少吗?
-- Porcelanosa (大概是$13/sqrt)
不幸的事情又发生了,橱柜还是没有8尺水平,比上次好很多,但是还是没有完全水平。好在LG还比较handy,亲自出马把橱柜调好。这样才能装
countertop.不然的话,他们再来一次还要花几百大刀。其实最好是让contractor在现场,让他们来调,确保没问题了再走。--我做re-surfacing, 水平也会出问题吗?
--- It is possible but very unlikely
countertop需要等24小时才能踩,所以今天没有什么进展。--为什么countertop要踩??
-- 因为要站在上面安装一些东西
Day 31-32
contractor来装电器和给backsplash上grout. --很喜欢MM的back splash,是什么材料?能给个参考价吗?是实际需要多少就买多少吗?
-- Porcelanosa (大概是$13/sqrt)
非常谢谢LZ的解答。
请问你用的backsplash 是品牌叫Porcelanosa? 具体是什么材质呢?瓷砖?glass tile? or ....?
以下是引用eowynzh在7/25/2011 8:33:00 PM的发言:
非常谢谢LZ的解答。
请问你用的backsplash 是品牌叫Porcelanosa? 具体是什么材质呢?瓷砖?glass tile? or ....?
以下是引用judi_123在5/21/2012 2:21:00 PM的发言:
Thanks for sharing.
Porcelanosa家的tile是有点小贵。我买的都是$10-15/sqrt的样子。
Countertop是从United Granite&Marble家买的。
15/sqrt!!! mm一定是理工科女生!你这总共人工费花了多少?谢谢
以下是引用chhnny在5/30/2012 2:40:00 AM的发言:
mm, 请问你们island上面三个白色的吊灯是在哪儿买的?好漂亮啊!
[此贴子已经被作者于2012/5/30 13:19:09编辑过]
以下是引用whycare在5/30/2012 10:24:00 AM的发言:
进来看图的。变化太大了。新版本很震撼,视觉效果真好。就是现在用起来是不是得不停的收拾啊?
以下是引用LeReve在5/30/2012 1:31:00 PM的发言:
mm,counter depth 的冰箱好用么?有没有觉得不够用?
我家只有俩猫娃,没觉得不够用。父母来住的时候也没觉得有什么问题。不知道有小人娃的家里会不会需要更多的空间。不过非counter depth的太占地方了,我想如果在车库里加一个Freezer的话应该就都足够用了吧。
谢谢!counter-depth确实比一般的看着好看很多,就是担心不够用。mm这么一说,就放心啦。
谢谢!counter-depth确实比一般的看着好看很多,就是担心不够用。mm这么一说,就放心啦。
以下是引用笨笨狗狗在5/29/2012 2:12:00 AM的发言:
15/sqrt!!! mm一定是理工科女生!你这总共人工费花了多少?谢谢
以下是引用yimchen在5/29/2012 12:22:00 AM的发言:
哇 楼主好强啊,谢谢楼主提供经验,非常有用!!!